In this paper we show how to build an economically optimal feedback control strategy for the re-dispatch of electricity generation. We assume that the operator steers production in a set of controllable power plants by altering the active power set-point of each generator, within a set of predefined set-points. The operators strategy will be based on balancing the operating cost against the expected cost from unserved demand. Important aspects are ramp-rates at which production can approach the set-point, and switching costs arising from increased fuel consumption during ramping and wear and tear on production facilities.

Details

Authors
  • Magnus Perninge
  • Robert Eriksson
Organisations
External organisations
  • Swedish National Grid
Research areas and keywords

Subject classification (UKÄ) – MANDATORY

  • Other Electrical Engineering, Electronic Engineering, Information Engineering
Original languageEnglish
Title of host publicationEEEIC 2016 - International Conference on Environment and Electrical Engineering
PublisherInstitute of Electrical and Electronics Engineers Inc.
ISBN (Electronic)9781509023196
StatePublished - 2016 Aug 29
Peer-reviewedYes
Event2016 IEEE 16th International Conference on Environment and Electrical Engineering - Florence, Italy
Duration: 2016 Jun 72016 Jun 10

Conference

Conference2016 IEEE 16th International Conference on Environment and Electrical Engineering
CountryItaly
CityFlorence
Period2016/06/072016/06/10

Related projects

Magnus Perninge

2014/01/012016/12/31

Project: Research

View all (1)