Gas turbine laboratory

Infrastructure

    Infrastructure Details

    Description

    The lab is based around a natural gas fired T100 micro gas turbine (electrical output: 100 kW) originally developed by Turbec. Cycle modifications (e.g. humidification of the cycle, alternative fuel tests) are possible. Presently no optical access is available, but possible in future. The gas turbine is connected to the electrical grid.

    Equipment and resources

    - Exhaust emission analyzers
    - Cooling tower
    - Natural gas connection
    - Large exhaust system

    Management of the infrastructure

    Division of Thermal Power Eng.

    Subject classification (UKÄ)

    • Engineering and Technology

    Type of infrastructure

    • Equipment