Traditionally, only hydropower plants, fossil-fired power plants are used for blackstart of the electric power system after a blackout. Wind power is much more geographically distributed than these traditional blackstarting units, but only recently got the capability for energizing a network. The project evaluates methods for using wind turbine generators combined with battery storage for blackstart and power system restoration.
Acronym | VINST |
---|---|
Status | Finished |
Effective start/end date | 2020/02/01 → 2023/12/31 |
Funding
- Swedish Energy Agency
UKÄ subject classification
- Other Electrical Engineering, Electronic Engineering, Information Engineering
Free keywords
- power electronic converter
- power system restoration
- blackstart
- grid-forming control