Abstract
IFMIF-DONES (International Fusion Materials Irradiation Facility- DEMO-Oriented Neutron Early Source) - a powerful neutron irradiation facility for studies and certification of materials to be used in fusion reactors - is planned as part of the European roadmap to fusion electricity. Its main goal will be to characterize and to qualify materials under irradiation in a neutron field similar to the one faced in a fusion reactor. The intense neutron source is produced by impinging deuterons, from high-power linear deuteron accelerator, on a liquid lithium curtain. The facility has accomplished the preliminary design phase and is currently in its detailed design phase. At the present stage, it is important to have a clear understanding of how the commissioning of the facility will be performed, especially the commissioning of a 5 MW CW deuteron beam, together with the lithium curtain and the beam optimization for the neutron irradiation. In this contribution, the present plans for the hardware and beam commissioning of the accelerator will be given, focusing on the most critical aspects of the tiered approach and on the integration of the procedure with the lithium and test systems.
Original language | English |
---|---|
Title of host publication | LINAC 2022 - International Linear Accelerator Conference, Proceedings |
Publisher | JACoW Publishing |
Pages | 331-334 |
Number of pages | 4 |
ISBN (Electronic) | 9783954502158 |
DOIs | |
Publication status | Published - 2022 |
Event | 31st International Linear Accelerator Conference, LINAC 2022 - Liverpool, United Kingdom Duration: 2022 Aug 28 → 2022 Sept 2 |
Publication series
Name | Proceedings - Linear Accelerator Conference, LINAC |
---|---|
ISSN (Print) | 2226-0366 |
Conference
Conference | 31st International Linear Accelerator Conference, LINAC 2022 |
---|---|
Country/Territory | United Kingdom |
City | Liverpool |
Period | 2022/08/28 → 2022/09/02 |
Subject classification (UKÄ)
- Accelerator Physics and Instrumentation