TY - GEN
T1 - Concurrent process planning and scheduling applied into production of turned parts
AU - Tavčar, Jože
AU - Slak, Aleš
AU - Duhovnik, Jože
PY - 2013
Y1 - 2013
N2 - The paper presents an application of concurrent process planning and scheduling into the manufacturing company of turned parts. The first topic is strategic resource optimisation in the phase of new products process plan development. The second topic is how to handle consequences of unplanned events like urgent order from an important customer or a machine brake down. In order to optimise the efficiency of turning manufacturing process, the process has been analyzed and re-engineered. All data from production (operations, quantities, date, time duration of operations, etc.) is now located in ERP system. It provides the necessary condition for the establishment of a robust planning and scheduling model. The article presents the information support and the algorithm based on genetic algorithm. Production capacities have to be linked up with a supply chain and customers. The presented planning and scheduling model can be adapted to various types of production.
AB - The paper presents an application of concurrent process planning and scheduling into the manufacturing company of turned parts. The first topic is strategic resource optimisation in the phase of new products process plan development. The second topic is how to handle consequences of unplanned events like urgent order from an important customer or a machine brake down. In order to optimise the efficiency of turning manufacturing process, the process has been analyzed and re-engineered. All data from production (operations, quantities, date, time duration of operations, etc.) is now located in ERP system. It provides the necessary condition for the establishment of a robust planning and scheduling model. The article presents the information support and the algorithm based on genetic algorithm. Production capacities have to be linked up with a supply chain and customers. The presented planning and scheduling model can be adapted to various types of production.
KW - Concurrent engineering
KW - Genetic algorithm
KW - Optimization
KW - Process planning and scheduling
KW - Turned parts production
U2 - 10.1007/978-1-4471-4426-7_71
DO - 10.1007/978-1-4471-4426-7_71
M3 - Paper in conference proceeding
AN - SCOPUS:84894082071
SN - 9781447144250
VL - 1
T3 - Advanced Concurrent Engineering
SP - 837
EP - 848
BT - Concurrent Engineering Approaches for Sustainable Product Development in a Multi-Disciplinary Environment - Proceedings of the 19th ISPE International Conference on Concurrent Engineering
PB - Springer
T2 - 19th ISPE International Conference on Concurrent Engineering, CE 2012
Y2 - 3 September 2012 through 7 September 2012
ER -