Controlled island operation of part of the 50-kV grid in Southern Sweden

Math Bollen, Olof Samuelsson

Research output: Chapter in Book/Report/Conference proceedingPaper in conference proceedingpeer-review

Abstract

Abstract in Undetermined
This paper is based on measurements obtained during a test of controlled islanding of part of the 50-kV grid in Southern Sweden. The purpose of the test was to verify operation of generator controls during islanding. The variations in voltage magnitude and frequency are shown as well as flicker severity and very-short variations. A number of performance indices have been calculated and compared with limits. Voltage magnitude and frequency have been studied in some detail around the disconnection and reconnection instants. The frequency varies much more during the island operation than during grid-connected operation. Voltage magnitude variations and flicker remain within their normal range. However the variations in the time range between 3 seconds and 10 minute appear to be higher than normal.
Original languageEnglish
Title of host publicationPowerTech, 2009 IEEE Bucharest
Pages1-6
DOIs
Publication statusPublished - 2009
EventIEEE Power Tech 2009 - Bucharest, Romania
Duration: 2009 Jun 282009 Jul 2

Conference

ConferenceIEEE Power Tech 2009
Country/TerritoryRomania
CityBucharest
Period2009/06/282009/07/02

Subject classification (UKÄ)

  • Other Electrical Engineering, Electronic Engineering, Information Engineering

Fingerprint

Dive into the research topics of 'Controlled island operation of part of the 50-kV grid in Southern Sweden'. Together they form a unique fingerprint.