Abstract

Precipitation is intrinsically associated with high uncertainty, which is exacerbated exponentially over time—especially concerning climate change. However, the current design practice in urban drainage infrastructure remains firmly bound to deterministic assumptions regarding the design load. This approach is too simplified—focusing only on the return period of the design event—and ignores the complexity of drainage systems, the potential changes in catchment hydrology and the at-risk valuable assets within. Therefore, the current design approach is inherently an unsustainable practice that cannot deal with extreme uncertainties associated with urban drainage and flood resilience in changing climate and society. This paper examines the current deterministic design practice and encourages a collective discussion on the need for a paradigm shift in the engineering of pluvial floods toward a risk-based design. We believe that adopting a risk-based design will partially address the uncertainty and complexity of climate and urban drainage, respectively, although a method for the new practice in a risk-based design paradigm must be developed.
Original languageEnglish
Title of host publicationProceedings of the 39th IAHR World Congress (Granada, 2022)
PublisherThe International Association for Hydro-Environment Engineering and Research (IAHR)
Pages6955-6963
Number of pages19
DOIs
Publication statusPublished - 2022

Subject classification (UKÄ)

  • Oceanography, Hydrology, Water Resources

Fingerprint

Dive into the research topics of 'Management of urban floods based on tolerable consequences in an uncertain future'. Together they form a unique fingerprint.

Cite this