Abstract
During the last 15 years cycles with CO, capture have been in focus, due to the growing concern over our climate. Often, a natural gas fired combined cycle with a chemical absorption plant for CO, capture from the flue gases have been used as a reference in comparisons between cycles. Neither the integration of the steam production for regeneration of amines in the combined cycle nor the off-design behaviour of such a plant has been extensively Studied before. In this paper, the integration of steam production for regeneration of the amines is modelled at design load and studied in off-design conditions for a combined cycle. Different ambient conditions and part-load strategies and their influence on the cycle performance are also examined. Of particular interest is a novel strategy with the possibility of longer life of gas turbine blading, with marginal loss in efficiency. The off-design performance of the combined cycle is modelled in a rigorous Way using a gas turbine performance deck, while the boiler is calculated using simplified correlations for oft-design heat transfer and pressure drop. The steam turbine calculation is based on verified models for the flow-pressure-efficiency relations, whilst the steam condenser is based oil the HEI method.
Original language | English |
---|---|
Pages (from-to) | 353-359 |
Journal | Energy |
Volume | 32 |
Issue number | 4 |
DOIs | |
Publication status | Published - 2007 |
Subject classification (UKÄ)
- Energy Engineering
Free keywords
- off-design
- CO2 capture
- combined cycles