Abstract
The commissioning and operations planning for the European Spallation Source is currently being defined. It is foreseen that the ESS will begin to deliver beam on target by mid 2019, something which is urging a well structured and thought through plan both for commissioning and operations. In this paper we will discuss the plans for beam physics operational software, priorities and software services needed during the different stages of beam commissioning.
Original language | English |
---|---|
Pages | 3086-3089 |
DOIs | |
Publication status | Published - 2016 Jun 3 |
Event | 7th International Particle Accelerator Conference, IPAC 2016 - Busan, Korea, Republic of Duration: 2016 May 8 → 2016 May 13 |
Conference
Conference | 7th International Particle Accelerator Conference, IPAC 2016 |
---|---|
Abbreviated title | IPAC'16 |
Country/Territory | Korea, Republic of |
City | Busan |
Period | 2016/05/08 → 2016/05/13 |
Subject classification (UKÄ)
- Electrical Engineering, Electronic Engineering, Information Engineering
Free keywords
- ESS, esss, DTL, drift, Tube, Linac, beam, dynamics, RF, radio, frequency, stabilization, post, couplers, coupler, tuner, tuners, pick, accelerating, sensitivity, tuning, tilt, pmq, permanent, quadrupole, focusing, detuning, mismatch, parameter, matched, twiss, parameters, phase, advance, cooling, stem, stems, compensation, software, emittance, growth, tune, depression, error, study, studies, position, monitor, monitors, steerers, adjust, steerer, rfq, input, alignment, angle, cavity, tank, dipole, static, dynamic, PIC-NIC, PIC-NIR, statistic, statistical, TraceWin, confidence, power, losses, lost, level, longitudinal, transverse, MEBT, medium, beta, high, average, commissioning, xal, control, software, room