TY - CONF
T1 - Spatial Planning and Sociology of Law: Sustainable development issues in constructing infrastructure for the third generation mobile telephone system in Sweden
AU - Larsson, Stefan
AU - Åström, Karsten
PY - 2007
Y1 - 2007
N2 - The infrastructure for the third generation of mobile telephony, UMTS, is under construction in Sweden. Within three years four operators were to build competing systems to cover 99,98 % of the population.
The case of the 3G infrastructure illustrates how sustainability issues are handled in planning and environmental management, with conflicting goals between institutional levels and contradictory legislation. At the national level economic and technological optimism and regional policy is in conflict with environmental and sustainability goals. No comprehensive assessment was made of the entire system; the infrastructure is assessed through one permit for each mast, at the local level, giving the administrative system an extreme challenge, and giving unexpected environmental and social outcomes as a result from the lack of comprehensive assessment.
Based on surveys of all local planning authorities, a regional sample of permit processes and examination of legal cases the paper examines the outcomes of the fragmented assessment of the local permit process level, from a sustainability perspective. What are the emerging effects and conflicts? The role of law in central planning with local outcomes in the case of regulating and controlling spatial planning in the case of 3G, will be analysed in this paper.
AB - The infrastructure for the third generation of mobile telephony, UMTS, is under construction in Sweden. Within three years four operators were to build competing systems to cover 99,98 % of the population.
The case of the 3G infrastructure illustrates how sustainability issues are handled in planning and environmental management, with conflicting goals between institutional levels and contradictory legislation. At the national level economic and technological optimism and regional policy is in conflict with environmental and sustainability goals. No comprehensive assessment was made of the entire system; the infrastructure is assessed through one permit for each mast, at the local level, giving the administrative system an extreme challenge, and giving unexpected environmental and social outcomes as a result from the lack of comprehensive assessment.
Based on surveys of all local planning authorities, a regional sample of permit processes and examination of legal cases the paper examines the outcomes of the fragmented assessment of the local permit process level, from a sustainability perspective. What are the emerging effects and conflicts? The role of law in central planning with local outcomes in the case of regulating and controlling spatial planning in the case of 3G, will be analysed in this paper.
KW - Sustainability issues.
KW - 3G
KW - The role of law in planning
KW - Spatial Planning
KW - Infrastructure for the third generation of mobile telephones system
KW - Sociology of Law
KW - Sustainable development
KW - spatial planning and environmental management
KW - UMTS
M3 - Paper, not in proceeding
T2 - Law and Society Annual Meeting, 2013
Y2 - 30 May 2013 through 2 June 2013
ER -