The Quadratic Utilization Upper Bound for Arbitrary Deadline Real-Time Tasks

Enrico Bini

Research output: Contribution to journalArticlepeer-review

Abstract

In high throughput applications, such as in multimedia, it is preferable to fully utilize computing resources, even at the price of some (bounded) delay. However, in real-time systems, where the maximum admissible delay is modeled by a deadline, most of the theory is developed with the assumption of a task deadline smaller than or equal to the task period. The reason of this limitation is in the intrinsic difficulty of the schedulability analysis in the arbitrary deadline case. The most notable guarantee test for sets of arbitrary deadline tasks was due to Lehoczky in 1990. In this paper, we propose the quadratic utilization bound applicable to tasks with arbitrary deadline, which extends Lehoczky’s result. The improvement is made possible by providing some information about the task periods.
Original languageEnglish
Pages (from-to)593-599
JournalIEEE Transactions on Computers
Volume64
Issue number2
DOIs
Publication statusPublished - 2015

Subject classification (UKÄ)

  • Control Engineering

Fingerprint

Dive into the research topics of 'The Quadratic Utilization Upper Bound for Arbitrary Deadline Real-Time Tasks'. Together they form a unique fingerprint.

Cite this