An overview of the insertion devices (ID) activities at MAX IV Laboratory will be presented. This paper describes the current status of the MAX IV insertion devices and the first commissioning results of some of the first 12 IDs installed at the three accelerators in MAX IV laboratory. The IDs are two Elliptically Polarizing Undulators (EPU), two In-Vacuum Undulators (IVU) and one In-vacuum wiggler installed at 3 GeV ring, four EPUs and one planar undulator in the 1.5 GeV ring and 2 IVUs at the Short pulse facility installed at the 3 GeV Linear accelerator for spontaneous emission. The impact of the first commissioned IDs on the electron beam in terms of orbit distortion and machine optics and the correction schemes to reduce these effects are described. The comparison between collected spectra from few beamlines and estimated photon flux based on magnetic field measurement maps is presented.

Details

Authors
Organisations
Research areas and keywords

Subject classification (UKÄ) – MANDATORY

  • Accelerator Physics and Instrumentation
Original languageEnglish
Title of host publicationProceedings of the 13th International Conference on Synchrotron Radiation Instrumentation, SRI 2018
PublisherAmerican Institute of Physics Inc.
Volume2054
ISBN (Electronic)9780735417823
Publication statusPublished - 2019 Jan 15
Publication categoryResearch
Peer-reviewedYes
Event13th International Conference on Synchrotron Radiation Instrumentation, SRI 2018 - Taipei, Taiwan, Province of China
Duration: 2018 Jun 112018 Jun 15

Conference

Conference13th International Conference on Synchrotron Radiation Instrumentation, SRI 2018
CountryTaiwan, Province of China
CityTaipei
Period2018/06/112018/06/15