Production scheduling in the process industry

Anna Lindholm, Pontus Giselsson, Nils-Hassan Quttineh, Helene Lidestam, Charlotta Johnsson, Krister Forsman

Forskningsoutput: KonferensbidragKonferenspaper, ej i proceeding/ej förlagsutgivetPeer review

220 Nedladdningar (Pure)

Sammanfattning

The purpose of this paper is to formulate an optimization model for the production scheduling problem at continuous production sites. The production scheduling activity should produce a monthly schedule that accounts for orders and forecasts of all products. The plan should be updated every day, with feedback on the actual production the previous day. The actual daily production may be lower than the planned production due to disturbances, e.g. disruptions in the supply of a utility. The work is performed in collaboration with Perstorp, a world-leading company within several sectors of the specialty chemicals market. Together with Perstorp, a list of specifications for the production scheduling has been formulated. These are formulated mathematically in a mixed-integer linear program that is solved in receding horizon fashion. The formulation of the model aims to be general, such that it may be used for any process industrial site.
Originalspråkengelska
Antal sidor6
StatusPublished - 2013
Evenemang22nd International Conference on Production Research - Iguassu Falls, Brasilien
Varaktighet: 2013 juli 282013 aug. 1

Konferens

Konferens22nd International Conference on Production Research
Land/TerritoriumBrasilien
OrtIguassu Falls
Period2013/07/282013/08/01

Bibliografisk information

key=lindholm13icpr
project=upsetmanagement

Ämnesklassifikation (UKÄ)

  • Reglerteknik

Citera det här